Some more progress, the Foc’s’le deck level fittings are mostly done. boats, railings, life rafts to add. The kit pompoms were replaced with Black cat 3d printed parts, nothing wrong with the kit parts, but these were the easier route.
Boats, quarterdeck fittings, mostly depth charge related and the masts to be done.
Cheers, Si
Some progress over the last few weeks, starting at the bow.
Railings and anchor cables.
midships.
Boats and rafts.
Aft, quarter deck railings, stern depth charge rails, and all eight depth chart throwers, four have their reload racks fitted in place, four more to do. Davits for the boats, masts, jack and ensign staffs, rigging, props etc and I can commission this one, more escort vessels to dome.
Cheers,
Si
A bit more progress.
All the depth gear on the quarterdeck fitted.
,Apart from the rigging the boats done, I did add some oars from the spare etch box to whaler, the foremast is in place, although not fitted on the below pic is the vestigial main mast.
An overview, all that is needed is the decals for the pennant numbers to put on and the rigging and the jack & ensign staffs.
The mainmast is in place between the vents just aft of the pompom platform.
Should be commissioning within the next 7-10- days, mind this is a British Shipyard, late delivery is likely.
Cheers, Si