M9 ACE 1/35 Takom

I have not. It looks quite good and I’m enjoying Bison126’s progress.

Below is how ours were painted. Note how the paint on the upper and lower bull blade is worn away. The lower blade is folded upward for traveling. The paint on the back side of the lower blade generally remained kind-of, sort-of intact. When folded up, the vehicle’s camo remained effective, no display of a big silver “shoot me” billboard.

The original ACE required that the lower bull blade be folded up manually which could take a half hour or more to do. Modern ACEs’ lower bull blades are folded hydraulically.

The original ACE bull blade was made of an aluminum alloy but the reinforcing cutting strip on the bottom was steel. So the strip had a slightly different metallic color to it. The aluminum blade was prone to major structural damage when cutting soil in rocky terrain. After much complaining by us and many others, the aluminum blades were later replaced with steel bull blades which were much better.

Not visible in the photo below is the forward, bottom edge of the pan. This was also a blade, called a “scraper blade” by us, used to cut soil in order to self-fill the pan. Self-filling the pan works when the soil is soft and loose. It does not work in rocky terrain. Often, we used an excavator to fill the pan. It was faster. The scraper blade was lowered into position by lowering the whole vehicle. This was possible because the ACE has a “hydropneumatic suspension system”. To lower the nose, the driver can hydraulically raise or lower individual road wheel stations. To begin a cut, the front suspension is lowered, pitching the entire vehicle forward to drive the bull blade or scarper blade deep into the soil.

The pan (some call it a “bowl”) can be emptied by the driver. Just in front of the driver, at the back of the pan, is what’s called an “ejector plate”. The ejector plate is a vertical metal plate that moves forward hydraulically to push soil out of the pan. The pan can hold as much as 10 tons of soil as ballast. This turned out to be too heavy for early ACEs’ transmissions.

Stung by early ACE mechanical unreliability, the ACE was improved by what was called the System Improvement Program (SIP) which was done at least 3 times. According to Google, they were:

• SIP Phase 1 (Early 1990s): Added steel skid plates, bolt-on front track retainers, high-pressure hydraulic filters, battery box deflectors, ejector debris shields, and a rear bump stop modification. It also provided an upgraded winch insert and scarifier blades (sub-surface teeth used to break up hard ground) for half the fleet.
• SIP Phase 2: Introduced thicker road-arm retainers, preformed radiator hoses to reduce leaks, lengthened oil drain lines for easier servicing, and a redesigned parking brake and steering rod linkage.

Comfort and Automation: SIP Phase 4

As the vehicle continued to evolve, SIP-4 addressed core operational improvements, including:
• Microclimate Cooling Unit (MCU): An automated crew cooling system designed to keep the lone operator from overheating while buttoned up inside an armored shell under intense heat.
• Automatic Blade Folder: The legacy M9 required the crew to physically exit the vehicle and spend up to 30 minutes manually folding the massive bull blade before driving cross-country. SIP-4 prioritized an automatic, remote-controlled blade-folding mechanism operated entirely from inside the safety of the cab.

Marine Corps ACES are reported be be very advanced. They include a much more powerful engine, reinforced hull, joystick controllers, 10-camera vision system, and an automated fire suppression system. I don’t know if Army ACEs got these upgrades. If not, the Marine Corps’ ACEs would be the most capable and easiest to maintain.

10 Likes

The name “Dirt Diggler” comes from Desert Storm. This means that the M9 ACE known as “Dirt Diggler” and the other known as “Bounty” were very early ACEs with aluminum bull blade and original, unreinforced hull.

The unconfirmed story goes that a bored M9 ACE operator remembered as being named “Nate” was waiting a long time for the order to move out. He decided to pull out a can of spray paint and graffitied “Dirt Diggler” across his bull blade which supposedly was a play on the main character Dirk Diggler from the movie Boogie Nights.

The vehicle was assigned to Charlie Company, 9th Engineer Battalion, which was a VII Corps unit and had deployed from Aschaffenburg, Germany and fought under the 1st Infantry Division with 1ID’s own 1st Engineers during Desert Storm. The 9th Engineers’ vehicles remained painted in the green they wore in Germany while the 1st Engineers’ vehicles were painted sand. thus, it was easy to tell which battalion the vehicles belonged to during the operation.

The Sister Vehicle: right after Nate painted his blade, a second M9 ACE operator in the unit followed suit and spray-painted his blade with the name “The Quicker Picker Upper, Bounty”.

As you can imagine, the chain of command had a freakin’ cow when they discovered the unauthorized graffiti on the combat vehicles. I remember the 9th Engineer Battalion commander, LTC Richard Jemiola, as a no-nonsense guy with a temper and he would have been, to put it mildly, “displeased”. If the story’s details are true, that graffiti came off quickly. However, photographs taken of the two vehicles by Specialist Andrew Patton captured them post-operation, preserving “Dirt Diggler” and “Bounty” in military history and making it an iconic image of the M9 ACE.

Sadly, Colonel Jemiola passed away in 2019 at the age of 70.

9 Likes

Beau travail, Olivier! Continue comme ça !

2 Likes

Personally, I like the M9 ACE. It had teething problems when first delivered and was also used outside of it’s mission profile, resulting in criticism from the users. It’s not a D7 dozer and it never will be, but as a self deployable lightweight digging tool for used for survivability positions, obstacle clearing and defensive barriers it had a role the D7 / M916 and M870 could never fill.

This is my M9 ACE build …

15 Likes

Kind of a weird mashup of these three machines! the D7, the 830 scraper with the Marines Eilco dozer thrown in . Sorry, pics in reverse order. Wayne

5 Likes

Speaking of earthmovers. what has happened to M105 DEUCE? I haven´t seen much of the vehicle on the net?

1 Like

Nicely done ACE!

1 Like

Made some progress in the last days.
The hull is nearly complete. The blade is assembled and I temporarily mated it to the hull.

Olivier

10 Likes

Takom offer you two options for the blade as per the pictures.


The blade has been definitely assembled to the hull. I decided to glue it since I don’t want to play with it.

Olivier

12 Likes

I remember when that happened. The guys in my unit, 3rd ACR, thought the whole thing was just stupid! As soon as those vehicles started working, the painted names would get scoured off by the dirt and the whole thing would be moot. And besides, we thought the name “Dirt Diggler” was cool.

Ken

4 Likes

I applied the basic colors to the M9. I used XF-65 Field Grey and Prince August 26 US Tan Vietnam.

Since I took the pictures I have fixed the overspray and hand painted the sand patches.

Olivier

9 Likes

Today I finished the basic painting. The sand and black patches have been applied with a fin brush. Then I painted the various details. However I don’t know the color of the extinguisher in the rear compartment. Considering it is outside, I guess it would be green and not red.
The blade will be heavily worn out with the metal appearing. I also plan to add some mud or dried earth on the blade and the running gear.

Olivier

16 Likes

That’s nice work indeed. In fortunately my walk around from Fort Leonard Wood is of a m museum, and as such and so little to answer the question about metal wear above.

1 Like

Looking good so far
:+1:

1 Like

Im not sure but didnt the ARMY or MARINES or one of them upgrade it to a A1

And is it still in service?

The US Army is the only operator of the M9 ACE.

South Korea has the KM-9, built under license by Samsung Techwin, and the Republic of China (Taiwan) also operates it.

and I don’t thing there’s an M9A1 upgraded ACE.

2 Likes

2014 the Marines got modernized M9s.

https://www.marines.mil/News/News-Display/Article/516022/2nd-combat-engineer-battalion-tests-new-combat-earth-mover/

2 Likes

According to the DVIDS website,101 Modernized M9 ACE’s were to be delivered to the United States Marine Corps by the end of Fiscal Year 2015.
https://www.dvidshub.net/news/122127/navy-fields-modernized-m9-ace-marines

H.P.

2 Likes

That would only be possible if “Nate” was a time traveller, given that Desert Storm was in 1991 and Boogie Nights came out in 1997.

2 Likes

Perhaps “Diggler” is the last name of the operator, which would make more sense.

Another online account attributed to Specialist Andrew Patton dates the graffiti’d ACEs to 2007 at Ramadi but still says they were C Co., 9th Engineer vehicles. Link:

2 Likes