Based on this picture 218 of sPzAbt 502 had hand drawn or rough markings in my opinion.
So the markings were applied by hand.
At this point I’m stuck waiting on the spare track links ordered a few days ago to arrive. Final filter and flat coat will be applied after track is installed.
Special guest appearance…
Working on this project again after several months away has me wanting to build a newer Tiger kit.
Edit - (6pm est) Later this evening the track links finally arrived! Painted “missing link” ( pun) and installed it.
Lot of details are damaged. Hope to repair them tomorrow, do filter & flat coat.