Let’s also come to the rigging.
First I built a device to run the longwave antennas parallel between the triangles.
This way you can get the same tension on both sides.
And the first threads are already hanging. Also to the funnel.
Now came a point that got on my nerves. Four cables each led from the two double-stranded long-wave antennas, which narrowed into one towards the mast.
Then the rest was easy. However, the rigging is not yet complete, as I still had to attach searchlights and anti-aircraft guns to the funnel. according to my motto, always work from the inside out.
The last two searchlights are on the gallery. Madness of the detail richness of Veteran Models.
With that to the on-board crane. First scratched two rope drums. OOB only bare roll.
The crane body is already finished and there are still endless components.
But that also went together. A lamp scratched and he can get on the deck. Fits perfectly in the mount on the tower.
Now the rest of the rigging can follow.